Testing and commissioning for MDP’s, SMDB’s and Low voltage panels in the project
Testing and commissioning for MCC’s including various types of controller such as VFD’s and soft starters.
Testing and commissioning for PFC’s Panels including various types of controllers.
Testing and commissioning for ATS Panels including various types of controllers.
Prepare all calculation studies such as cable current carrying capacity, short circuit, load flow and Protection… etc.
EARTHING AND LIGHTENING SYSTEMS TESTING FOR P2.05,P2.08, P2.10, P2.11, P2.12
AND P2.13 IN KAFD ZONE-2
• Testing of of EARTHING system:
Grid continuity test.
Measurement of earth resistance.
Installation checks and Torque check.
• Testing of Lightening system:
System continuity test
Measurement of equivalent resistance.
Testing of of MV Switchgear and MRMU:
Testing of SF3 6-PH 13.8KV circuit breakers (contact resistance, contact timing, insulation tests an high voltage test).
Testing of voltage and current transformers.
Testing of bus bars.
Testing of power meters.
Testing of sepam 40, protection relays.
Testing of power transformers:
Testing winding resistance and turns ratio.
Insulation resistance and polarization index.
Vector group check test.
Magnetization current test.
Thermal monitor relay test
Testing and commissioning of MV RMU:
Visual and mechanical inspection tests
Panel overall functional test
Earth switch mechanism and function tests
Insulation resistance
High Voltage test
Contact resistance
Current Transformer Test
Relay O.C & E.F test
Interlocking signa
• Design, supply, install, Testing and commissioning for PFC’sPanels to enhance the P.F of the system.
• Panel modification, Testing and commissioning for MDP’s, SMDB’s and Low voltage panels.
• Testing and commissioning for MCC’s including various types of controller such as VFD’s and soft starters.
• Testing and commissioning for ATS Panels including various types of controllers.
• Prepare all calculation studies such as cable current carrying capacity, short circuit, load flow and Protection… etc.
Testing and commissioning of medium voltage switchgear (euro power type) as the following:
Primary injection tests.
Secondary injection tests.
Mechanical tests
Function tests
C. T tests including(polarity test, ratio test and knee point test).
Vt tests.
rotective relays tests (SEPAM 80,40,20 and MICOM p441)
Testing of MV Switchgear:
Testing of SF3 6-PH 13.8KV circuit breakers (contact resistance, contact timing, insulation tests and high voltage test).
Testing of voltage and current transformers.
Testing of bus bars.
Testing of power meters.
Testing of ESERGY, protection relays.
Testing and commissioning of MV RMU:
Visual and mechanical inspection tests
Panel overall functional test
Earth switch mechanism and function tests
Insulation resistance
High Voltage test
Contact resistance
Current Transformer Test
Relay O.C& E.Ftest
Interlocking signals.
Testing of power transformers:
Testing winding resistance and turns ratio.
Insulation resistance and polarization index.
Vector group check test.
Magnetization current test.
Testing and Commissioning of 13.8 KV RMU:
Visual And Mechanical Inspection Tests.
Function And Operation Test.
Insulation Resistance.
Mv Rmu Inverse Time O/C & E/F Relay Test.
Contact Resistance Test.
Sf6 Gas Indication Check.
Testing and Commissioning of & 500
1000 KVA Step Down Oil Transformer:
Visual And Mechanical Inspection Tests.
Insulation Resistance And Polarization.
Index.
Winding Resistance Test.
Turns Ratio Test.
13.8 KV MV Cable Activity:
Cable Pulling And Arrangement.
Cable Termination.
Visual And Mechanical Inspection Tests.
Insulation Resistance Index.
VIf( Hipot Test).
Cable Connection And Torque.
Supply, Installation, testing and commissioning of the below items
• MRMU 4 way.
• Battery charger with battery bank.
• Transformers # 1000 KVA each.
• MDB main new ACB with BUS COUPER each # 2000 A with micro logic trip unit.
EMDB new ACB # 1000A with MICRO LOGIC trip unit.
• GEN SET 500 KVA.
• ATS panel 2000A & 1000A.
Main diesel tank 5000 L.
• Daily diesel tank 1000 L.
FM-200 and foam system with fire alarm system.
• Earthing system testing and commissioning.
Testing and commissioning of LV Switchgear
(MDB&DB& ATS) :
Visual and mechanical inspection tests
Testing of air & MCCB & MCB circuit breakers(primary and secondary injection) .
Testing of bus bars.
Insulation resistance.
Testing of power meters.
Panel overall functional test
Circuit breaker setting.
Actual Manual and auto transfer for ATS panels.
Earth leakage &RCD and RCBO test
Testing and commissioning of PFC & Starter and
MCC panels :-
Visual and mechanical inspection tests.
Panel overall functional test.
Testing of air & MCCB & MCB circuit breakers(primary and secondary injection).
Insulation resistance.
Capacitance measurement for PFC panels.
Actual Manual and auto operation for PFC panels.
VFD operation with temporary load(Starting &Ramp
UP/Down).
Starter Star/Delta auto change over.